  1. Fill Out the E-Application Form:
    • Visit the FESCO website or download the application form from their portal.
    • Provide accurate details such as your name, address, contact information, and the type of connection you require.
  2. Submit the Form:
    • Once you’ve filled out the form, submit it online.
    • FESCO ENC (Electricity New Connection) will take care of the rest.
  3. Prompt Application Processing:
    • The concerned department at FESCO promptly initiates the application process upon form submission.
    • No need to worry about long queues or exhausting office visits.
  4. Online Tracking:
    • FESCO’s online bill system allows you to track your application status conveniently from home.

Application for FESCO New Electricity Meter Connection 

If you’re looking to get a new electricity connection from FESCO (Faisalabad Electric Supply Company), follow these steps to make the process smoother:

  1. Visit the ENC System or Online Application Portal:
    • To apply for a new connection, start by visiting the ENC (Electricity New Connection) system or the online application portal. This step is essential to initiate the process.
  2. Complete the Application Form:
    • FESCO’s new connection application form consists of five steps, each with its own sub-steps. Make sure to fill out all the required fields accurately. Provide relevant and authentic information to ensure a smooth application process.
  3. Gather Necessary Documents:
    • Before applying, ensure you have the following documents ready:
      • A copy of your FESCO electricity bill from a neighboring property.
      • Proof of property ownership.
      • An attested copy of your CNIC (Computerized National Identity Card).
      • An attested CNIC copy of a witness.
      • The wiring contractor’s test report for your house.

FESCO New Connection Process

  1. Open the ENC Online Application Portal:
    • Start by launching the ENC online application portal on your desktop or laptop.
  2. Locate the “Apply” Button:
    • Once you’re on the homepage, find the “apply” button and click on it.
  3. Enter Your Neighbor’s Reference Number:
    • In the required field, input your neighbor’s reference number. The system will automatically populate other relevant fields, including your neighbor’s name, address, the distribution company name, and the corresponding sub-division details.
  4. Choose Your Load Details:
    • Depending on your connection type, select the appropriate load. For domestic connections, choose 5 KW. If you’re applying for industrial or commercial connections, the load will be above 5 KW.
  5. Select Connection Type:
    • If you’re applying for a residential connection, choose the “Domestic” type. For commercial connections, options like “Agricultural” and “Industrial” are also available.
  6. Specify Your Housing Situation:
    • If you live in a rental house and are applying for a new connection, select “Tenant.” If you own the house, choose “Landlord.”
  7. Provide Personal Information:
    • In the next tab, enter your full name with correct spellings. Additionally, fill in your father’s or husband’s name.
  8. Citizenship Details:
    • If you’re Pakistani, select the first option in the citizenship section. Then, write your CNIC (Computerized National Identity Card) number along with your address.
  9. Mobile Numbers:
    • Enter your personal mobile number in the first field and your father’s or husband’s mobile number in the second field.
  10. Contact Details for the New Connection:
    • If you’re the person acquiring the new connection, choose the same contact details as above. The system will automatically populate the relevant fields.
  11. Premises Details:
    • If you already have an installed electricity meter, provide the details here. Otherwise, select “0.”
  12. Load Requirement and Installation Address:
    • Specify your desired load for the new electricity connection and mention the address where you want to install the new meter.
  13. Step 13: Specify Your Appliances

In this section, you’ll need to list the appliances used in your home. If you have an air conditioner (AC), mention it in the designated field. Then, select the quantity of each appliance in the next tab. Additionally, provide the load consumed by each electric appliance.

Remember to add other appliances one by one using the “Add Row” option.

Step 14: Upload Scanned Copies

After completing the form, proceed to the next step: uploading scanned copies. Click the “Browse” button to upload the necessary documents mentioned earlier.

Step 15: Review and Agree

Before submitting the form, take a moment to review all the details and terms and conditions for the FESCO new connection request. Once you’re satisfied, hit the “I Agree” button.

For the final submission, enable the captcha and enter the required numbers in the designated field. Then, click the “Submit” button.

How to Check FESCO New Meter Connection Status

When you apply for a new connection, you’ll receive a tracking number. This number is essential for checking the status of your FESCO new connection application. Follow these steps:

  1. Visit the ENC Website: Go to the Electricity New Connection (ENC) website.
  2. Access the Tracking Page: Click on the “Track” button located on the left side of the webpage.
  3. Select Application Type: Choose the appropriate application type:
    • For a new connection installation, select “New Connection.”
    • If you’re monitoring a change of name, tariff, or load, choose the relevant option.
  4. Specify Company: Indicate that you’re applying for a new connection from FESCO (Faisalabad Electric Supply Company).
  5. Enter Tracking ID: Input the tracking number you received during your online application submission.

FESCO Demand Notice

When you submit an application for a new connection, the FESCO ENC team thoroughly reviews the entire process and manages it until completion. The ENC team closely monitors essential aspects, including service line length, conductors, and other necessary equipment required for installing the new meter connection. After assessing all the necessary factors, a demand notice will be issued.

You can track the status of your application, which will display either “Review completed” or “Pay Demand Notice Fee.” Additionally, you’ll be able to download your demand notice voucher through the ENC portal.

How to Apply FESCO Demand Notice Online

  1. Access the ENC Portal: Start by navigating to the ENC Portal.
  2. Print Button: On the left side of the page, locate and click the “Print” button.
  3. Application Type: After clicking, a form will appear on the right side. Choose the application type for the new connection.
  4. Enter Tracking Number: Once you’ve selected the application type, enter your new connection application tracking number in the provided field. Click “Submit.”
  5. Demand Notice Form: Finally, a demand notice form will open. You’ll have the option to either “Download” or “Print.” Review the form and select your preferred choice.

How to Submit Demand Notice Online

  1. Submit the New Connection Fee: After paying the FESCO new connection fee, you can proceed with the application process.
  2. Visit the ENC Portal: Go to the ENC Electricity New Connection (ENC) System website.
  3. Choose the “Upload” Option: On the ENC portal, select the “upload” option (usually indicated in the image or interface).
  4. Select Application Type: Set the application type as “new connection.”
  5. Enter Tracking Number: Enter your tracking number (provided during the fee payment process).
  6. Submit the Application: Click the submit button to proceed.
  7. Upload Scanned Copy of Demand Notice: A window will prompt you to upload the scanned copy of the demand notice. Upload the file and then click the save button. This action will submit your demand notice to FESCO management.

FESCO New Connection Demand Notice Fee 

“The cost of electricity service varies based on several factors. These include the length of the service line, the type of connection (whether it’s single-phase or three-phase), and whether the location is rural or urban

Here’s the information about FESCO new connection charges for different types of service connections:

Connection TypeCharges for FESCO New ConnectionAmount
Single Phase service connection (Rural) with 2 Core 10 sq mm PVCLength of service line up to and including 40 metersRs. 4,000
Length of service line 41-100 meters (with one span of Ant Conductor and one pole/structure)Rs. 4,000 + Rs. 200 per meter
Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures)Rs. 16,000 + Rs. 250 per meter
Single Phase service connection (Urban) with 2 Core 10 sq mm PVCLength of service line up to and including 40 metersRs. 4,000
Length of service line 41-100 meters (with one span of Ant Conductor and one pole/structure)Rs. 4,000 + Rs. 200 per meter
Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures)Rs. 16,000 + Rs. 250 per meter
Three Phase service connections (Both Urban & Rural) with 4 Core 10 sq mm PVCLength of service line up to and including 40 metersRs. 15,000
Length of service line 41-100 meters (with one span of Ant Conductor and one pole/structure)Rs. 15,000 + Rs. 260 per meter
Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures)Rs. 30,600 + Rs. 300 per meter
Length of service line 160-280 meters (with one span of Ant Conductor and two poles/structures)Rs. 48,600 + Rs. 340 per meter